Projects

Agromin Organics Recycling – Oxnard, CA

  • Prepared CEQA Technical Studies greenhouses gases, odor, and emissions
  • 5,000 dry anaerobic digestion demonstration project
  • 2,500 CYD CASP demonstration project
  • 60,000 TPY windrow composting
  • 300,000 TPY
  • 6 facilities

Blue Line Biogenic Fuel Facility –
South San Francisco, CA
First carbon negative dry AD facility fuel

  • 11,200 TPY dry anaerobic digestion and secured $2.6 million CEC grant
  • Prepared CEQA Technical Studies greenhouses gases, odor, emissions and energy
  • Obtain SWFP with permitting documents from 1,200 TPD to 2,000 TPD
  • Obtained carbon incentives (RINs) for the carbon negative fuel
  • RNG Fueling Station for a fleet of 18 trucks
  • Food waste de-packaging project
  • Prepared award-winning Sustainability Plan
  • Prepared verified GHG footprint since 2006
  • Integration with City Climate Action Plan

Cedar Avenue Recycling and Transfer Station –
Fresno, CA

  • Prepared Master Plan to 2030 to address AB 32
  • Prepared CEQA Technical Studies: greenhouses gases, odor, emissions and energy
  • Obtain SWFP with permitting documents from 3,100 TPD
  • Food waste de-packaging project
  • Food processing to wet AD at POTW
  • Integration with City Climate Action Plan
  • Integration with City Zero Waste Plan
  • 3,100 TPD
  • AB 1826 plans

Clover Flat Resource Recovery Park –
Calistoga, CA
Refocus landfill from disposal to diversion

  • Prepared Master Plan to 2050 to address AB 32
  • Prepared CEQA Technical Studies for greenhouses gases, odor, emissions and energy
  • Obtain Solid Waste Facility Permit (SWFP) with other permitting documents
  • 6,000 cubic yards (CYD) green waste covered aerated static pile (CASP)
  • 8,000 tons per year (TPY) food waste CASP
  • 0.75 mega-watt (MW) landfill gas to energy project
  • 1.0 MW biomass gasification energy project
  • Prepared GHG footprint for 2006, 2014, and 2020
  • Integration with County Climate Action Plan
  • Compost
  • Biomass gasification
  • Construction & Demolition
  • SWFP/CEQA
  • AB 1826 Plan

E. J. Harrison – Zero Waste Plan for the City of Ventura, CA

  • Prepared Zero Waste Plan
  • Analyzed and projected franchise recycling rate and Jurisdictional diversion rate
  • Developed a recycling and organic waste diversion program in concert with a franchise collection Plan
  • Analyzed programmatic impacts on diversion rates
  • Calculated the greenhouse gas impacts of zero waste programs
  • Calculating Integration with City Climate Action Plan and City Zero Waste Plan

Garaventa Enterprises – Mt. Diablo Resource Recovery Park, CA

  • Obtaining SWFP for 5,100 TPD facility
  • Prepared CEQA Technical Studies for greenhouses gases, odor, emissions and energy
  • 1.0 MW biomass gasification energy project
  • Developed organic waste recycling programs for Concord, Oakley, and Pittsburg
  • Used NAICS based employment figures and waste characterization to calculate each city’s projected AB 1826 diversion
  • Developed full lists of businesses that are subject to AB 1826 for each year of AB 1826 for each city
  • Compared NAICS based generation with disposal based estimates to project new diversion
  • Used projections of combined three cities to ascertain the level of organics processing capacity necessary per AB 876
  • Calculated greenhouse gas benefits of successful implementation of the AB 1826 plan
  • Integrated above elements into the hauler’s outreach program and the cities’ climate action plans

Green Waste Recovery/Zanker – San Jose, CA

  • Sustainability plans
  • Climate Action Planning

Marin Resource Recovery Center 
San Rafael, CA

  • Prepared CEQA Technical Studies for greenhouses gases, odor, emissions and energy
  • Obtain SWFP with other permitting documents
  • 12,500 TPY dry anaerobic digestion facility
  • 5,000 TPY food processing to wet anaerobic digestion
  • 1.0 MW biomass gasification energy project
  • Prepared verified GHG footprint since 2006
  • Integration with City Climate Action Plan
  • Integration with County Zero Waste Plan
  • Developed organic waste recycling programs for San Rafael, San Anselmo, Greenbrae, Fairfax, and Larkspur
  • Used NAICS based employment figures and waste characterization to calculate each city’s projected AB 1826 diversion
  • Developed full lists of businesses that are subject to AB 1826 for each year of AB 1826 for each city
  • Compared NAICS based generation with disposal based estimates to project new diversion
  • Explored the impact of MSS’s food waste to anaerobic digestion program
  • Calculated greenhouse gas benefits of successful implementation of the AB 1826 plan

Mission Trail Transfer Station – Santa Clara, CA

  • 50 TPD food waste processing facility
  • Obtain SWFP with other permitting documents
  • Animal feed production by affiliated SAFE
  • Integration with City Climate Action Plan

Napa Renewable Resource Project – Napa, CA

  • 25,000 TPY dry anaerobic digestion and secured $3.0 million CEC grant
  • Prepared CEQA Technical Studies greenhouses gases, odor, emissions and energy
  • Obtain SWFP with permitting documents for 760 TPD
  • Permitting CASP system
  • Food waste de-packaging project
  • Integration with City Climate Action Plan
  • Net Zero Recycling Facility
  • Biomass gasification
  • $3.0 million grant

Peña Organic Energy Park Cutler, CA

  • 500 TPD to 2,000 TPD
  • Net Zero Recycling Facility
  • Biomass gasification
  • SWFP/CEQA
Skip to content